|
Initial Training Network FIRST November 16th, 2012. 13:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
Most of the mathematicians employed in this ITN in the field of image processing are collaborating with researchers from other fields as it is the case of the Technion Computer Sciences and Electrical Engineering departments. The areas and problems of interest in PDE-based methods for Image Processing and Analysis in which the teams joining forces will be active are: i) Image Denoising and Edge Preserving Enhancement and Variational and PDE- based approaches, ii) Video Processing: Optic Flow Estimation by Over-Parameterized Variational Methods and Variational Methods for Deinterlacing, iii) Image Restoration and Inpainting, iv) Image and Video Coding Compression: Up-Scaling and Down-Scaling and Image and Video Sampling Issues, v) Scale Space Processing: Image Representations in Overcomplete Dictionaries and Sparse Representations and Their Uses. Concrete subprojects of WPA and available ESR contracts
Work package B is devoted to the mathematical modelling, analysis and numerical analysis of reaction-diffusion systems arising in various application fields such as population dynamics, ecology, phase transitions and flame propagation, as well as the transport of contaminants in aquifers. Concrete subprojects of WPB and available ESR contracts
Many different problems will be considered in this research direction. Some special emphasis will be set on nonlinear processes involving, e.g., fluid flow and large elastoplastic deformations. Concrete subprojects of WPC and available ESR contracts The following table summarizes the available ESR contracts (in the application which ends on June 15, 2010) and the number of months to be spent in each Full Member
|